Thank you for your interest in Net Metering. Our goal is to provide you with accessible information to make your interconnection as streamlined as possible. This page provides several links for the documents you will need to get started.
Two of the documents are PRC RULE 568 and the New Mexico Interconnection Manual, which is referenced in Rule 568. The interconnection manual includes the Simplified Interconnection Application on page 24, which will be the application required for interconnecting with our distribution system for most residential customers.
Another document is the New Mexico PRC RULE 570, which describes the credit you would receive should you generate more power than you consume over a given billing period. This credit would be equal to RCEC’s avoided cost, which is filed in January of every year with the PRC. RCEC’s 2026 avoided cost is $0.02874.
Prior to interconnection, you should have all required paperwork and applications submitted. We will also need to inspect your installation, possibly change your meter, and have written approval from the state electrical inspector. Please contact us at (575) 356-4491 and let the operator know you are calling about Net Metering if you have any other questions or if you need more information.
On October 1, 2021, a rate rider went in to effect to assure that consumers choosing to install a distributed generation (DG - such as wind or solar) system continue to pay their fair share of the costs of construction, operation and maintenance of the RCEC electric system that are incurred by RCEC to serve these members. This change affected Rate No. 1 - General Service, Rate No. 2 - Commercial Service and Rate No. 3 - Irrigation Pumping and Dryer Service by introducing a rate rider for RCEC members who chose to purchase and install a DG system after October 1, 2021. More information regarding this rate change can be obtained directly from the New Mexico Public Regulation Commission website or from our office.
Terms & Conditions of Interconnection
Certification Codes and Standards
Standard Interconnection Application-Greater Than 10 kW
Interconnect Agreement 10 kW & below-Updated
Interconnection Agreement-Over 10 kW
Interconnection & Safety Standards
Certification of Completion by Electrician